Answer:
a.1080
Step-by-step explanation:
If the overhead for this project is 50% of the labor and material costs, the cost is 1.5 times the labor and material costs.
Materials cost is fixed at $520, while labor costs are variable at rate of $10. If project requires 20 labor hours, total cost is:
The total cost will be $1,080.