Answer:
$33,000
Step-by-step explanation:
The calculation of the fixed cost and the variable cost per machine hour by using high low method is shown below:
Variable cost per hour = (High manufacturing overhead cost - low manufacturing overhead cost) ÷ (High machine hours - low machine hours)
= ($198,000 - $153,000) ÷ (110,000 hours - 80,000 hours)
= $45,000 ÷ 30,000 hours
= $1.5
Now the fixed cost is
= High manufacturing overhead cost - (High machine hours × Variable cost per hour)
= $198,000 - (110,000 hours × $1.5)
= $198,000 - $165,000
= $33,000