Answer:
A. $194, 035
Step-by-step explanation:
Predetermined Manufacturing overhead Rate = Estimated total overheads / Estimated direct labor hours
Predetermined Manufacturing overhead Rate = $176,000 / 13,700
Predetermined Manufacturing overhead Rate = $12.85 / direct labor hour
Actual Labor hours = 15,100 hours
Manufacturing overhead allocated = $12.85x 15,100
Manufacturing overhead allocated = $194,035
The correct option is A. $194, 035