Answer:
True
Step-by-step explanation:
For computing the cost of the completed jobs in a job-order costing system we have to consider the actual direct materials cost, actual direct labor cost, and the manufacturing overhead cost applied.
In mathematically,
The total cost of completed job = Direct Material cost + Direct labor cost + manufacturing overhead cost
Therefore, the given statement is true