68.4k views
1 vote
Which graph shows the equation V = 4 + 2t, where V is the total volume of water in a bucket and t is the elapsed time in minutes? On a coordinate plane, the x-axis shows elapsed time in minutes (t) and the y-axis shows total volume of water (V). A straight line with a positive slope begins at point (0, 3) and ends at point (5.5, 24). On a coordinate plane, the x-axis shows elapsed time in minutes (t) and the y-axis shows total volume of water (V). Solid circles are at points (0, 3), (1, 6), (2, 10), (3, 14), (4, 18), (5, 22). On a coordinate plane, the x-axis shows elapsed time in minutes (t) and the y-axis shows total volume of water (V). A straight line with a positive slope begins at point (0, 4) and ends at point (6, 16). On a coordinate plane, the x-axis shows elapsed time in minutes (t) and the y-axis shows total volume of water (V). Solid circles are at points (0, 4), (1, 6), (2, 8), (3, 10), (4, 12), (5, 14), (6, 16).

User Viewed
by
5.6k points

2 Answers

5 votes

Answer:

C

Explanation:

User Pitosalas
by
5.4k points
4 votes

Answer:

The graph in option 3 will be the correct one.

Explanation:

We have to choose the graph from the given options that shows the equation V = 4 + 2t, where V is the total volume of water in a bucket and t is the elapsed time in minutes.

Now, the graph in option 3 will be the correct one.

On a coordinate plane, the x-axis shows elapsed time in minutes (t) and the y-axis shows total volume of water (V). A straight line with a positive slope begins at point (0, 4) and ends at point (6, 16). (Answer)

User Tripleonard
by
4.9k points