Answer:
correct option is C. 1.4
Step-by-step explanation:
given data
task times = 0.3 minutes
task times = 1.4 minutes
task times = 0.7 minutes
to find out
minimum cycle time in minutes
solution
we know that Minimum Cycle time is equal to the length of longest task time
so here in given task have longest time is = 1.4 minutes
so here Minimum Cycle time = 1.4 minutes
hence correct option is C. 1.4