The relative location problem deals with the problem of allocating n departments to n locations. Complete enumeration is time-consuming because there is a total of n! possible arrangements.

A. True
B. False

1 Answer

3 votes

Answer:

TRUE

Step-by-step explanation:

The topic of relative position deals with the issue of allocating n units to n sites. Comprehensive aggregation takes time because there is a total of n! The method for increasing the flow gap in a network structure by organizing the relative position of divisions is called the series analysis of the processes.

Therefore, the above statement is true.