Answer:
Step-by-step explanation:
The journal entry to record the over allocated amount is as follows:
Manufacturing overhead A/c Dr $2,000
To Cost of Goods sold A/c $2,000
(Being over-applied overhead is recorded)
Since there is an over applied overhead, so we debited the manufacturing overhead and credited the cost of goods sold so that the accurate posting could be done.