Answer:
Step-by-step explanation:
Total Cost = $280
Fixed Cost = $30
As we know that the the formula
Total variable cost= Total cost - Fixed cost
which means Total Variable cost = $280 - 30$ = $250
Average variable cost can be calculated = Total Variable cost / Quantity
which is = $250/$27