Which of these activities does not contribute to lean construction? Select one: a. Including factory-like production methods b. Decentralizing decision making c. Sequential construction d. Using BIM e. Streamlining workflows and supply methods

User Hllau
by
6.4k points

1 Answer

3 votes

Answer: C- Sequential construction

Explanation: Sequential construction analysis is a nonlinear static analysis which takes into account the concept of incremental loading.

when sequential construction is ignored, the analysis assumes that the entire loads are carried by the entire structure. Sequential construction is also important on analysis of high rise buildings where creep and shrinkage must be considered.