System-specific Validated Online Lifecycle Threat (VOLT) reports are required to be kept current and validated throughout the acquisition process. All Major Defense Acquisition Programs (MDAPs) must have a validated VOLT in place at:

1 Answer

1 vote

Answer:

System-specific Validated Online Lifecycle Threat (VOLT) reports are required to be kept current and validated throughout the acquisition process. All Major Defense Acquisition Programs (MDAPs) must have a validated VOLT in place at Milestones B and C.