93.0k views
19 votes
A construction company takes

1/6 hours to remove 1/2
metric tons of dirt from a construction site.

What is the unit rate in metric tons per hour?
Write your answer in simplest form.

User IniTech
by
5.3k points

1 Answer

12 votes

Answer:

3 tons per hour

Explanation:

Since 0.5=1/6

you can multiply 0.5 by 6:

0.5x6= 3

With an ending result of 3 tons per hour

User Borja Tarraso
by
5.0k points