An excess materials requisition is a control that signals that a greater than standard quantity of materials is being ordered from the vendor.True / False.

User Ermir
by
7.4k points

1 Answer

3 votes

Answer:

the correct answer is FALSE

Excess materials requisition is a form necessary to obtain any materials needed in excess of the standard amount allowed for the scheduled output.