47.2k views
0 votes
01:44:48

Read the text and study the diagram carefully
Which statement best describes the graphic provided in
this document?
PRESS RELEASE
FOR IMMEDIATE RELEASE
September 10, 2018
Fairfax Announces Construction of the UOSA Water
Reclamation Plant
The graphic is an illustration that shows how water
from a reservoir is recycled for reuse.
The graphic is a map that indicates how many
residences are near the reclamation plant
The graphic is an illustration that evaluates the quantity
of water recycled by the reclamation plant
The graphic is a map that gives a detailed depiction of
the results of water reclamation
In a positive move for residents concerned about water
preservation in our current drought, the city of Fairfax is
proud to announce plans for the UOSA Water
Reclamation Plant. After being completed in the spring of
2019, this state-of-the-art water-recycling facility will begin
supplementing the city's current water supply (the
Occoquan Reservoir) with runoff collected from Fairfax
homes and businesses. City officials anticipate that the
plant will feed 20,000 gallon
back into the municipal water supply
Submit
and Exit
Next
Mark this and return

2 Answers

3 votes

Answer:

c

Step-by-step explanation:

100% on edg

User Lesto
by
3.3k points
2 votes

Answer:

C

Step-by-step explanation:

User Suresh Atta
by
3.3k points