Answer: C. 6
Therefore, 6 machine R was used.
Explanation:
Given;
Time taken for machine R = 36 hours
Time taken for machine S = 18 hours
The fraction of work completed by machine R and S in 1 hour is ;
R = 1/36
S = 1/18
Let n represent the number of each type of machine used to do the job.
Time taken for n machine R and S is 2 hours.
The fraction of job completed by n Machine R and S is;
n(R +S) = 1/2
Since R = 1/36 and S = 1/18
n(1/36 + 1/18) = 1/2
n = 1/2/(1/36 + 1/18)
n = 6
Therefore, 6 machine R was used.