Total weighted score:
= (Labor cost score × Weight) + (currency stability score × Weight) + (proximity to market × Weight)
Weighted score for Site A:
= (80 × 0.40) + (80 × 0.30) + (85 × 0.30)
= 81.5
Weighted score for Site B:
= (80 × 0.40) + (85 × 0.30) + (80 × 0.30)
= 81.5
Weighted score for Site C:
= (75 × 0.40) + (80 × 0.30) + (95 × 0.30)
= 82.5
From the above calculation of weighted score, it can be seen that the weighted score of site C is the highest.
Therefore, Site C should be chosen for the new facility based on the weighted factory location model.