Answer:
The cost assigned to Job 7 at the end of the week is 5,700 dollars.
Step-by-step explanation:
In job order costing the cost that is to be assign to a specific order is sum of actual direct material cost and actual labour cost require to perform that job. Factory overheads are also added to the job cost on the basis of allocation method (on basis of budgeted applied OH rate).
So Following costs will be assign to Job 7.
RAW materail = $ 700
Labor Cost = $ 3000
Overhead = $ 2000 (10* 20)
Total Cost = $ 5700