Answer:
Predetermined overhead rates are calculated at the inception of an accounting period. The rates are obtained by dividing the value of the estimated production overhead by the activity base (also estimated). The value gotten from this formula represent the predetermined overhead rate, which is further applied in the manufacturing process to help in determining the standard cost for a product.
Step-by-step explanation: