Answer:
option B
Step-by-step explanation:
Prime costs refers to the expenses of a company directly linked to the labor and materials used during manufacturing. This relates to the expense of a product made, which is measured to provide a business with the highest profit margin.
A prime cost is really the cumulative direct costs of producing a commodity for sale, which can be constant or adjustable. Companies utilize prime costs as more of a method of measuring the overall cost of the development materials required to create a specific output.
Thus, from the above we can conclude that the correct option is B .