Answer:
Step-by-step explanation:
average velocity is 41.6/1.89 = 22.0 m/s
initial velocity u is
22.0 = (u + u - 9.81(1.89))/2
44.0 = 2u - 18.5
62.56 = 2u
u = 31.3 m/s
max height is
v² = u² + 2as
s = (v² - u²) / 2a
s = (0² - 31.3²) / (2(-9.81)) = 49.9 m
49.9 = 41.6 = 8.27 m higher