The Empire State Building has 102 stories. The building was created at a rate of 4 1/2 stories per week. How many weeks did it take to complete the building?

1 Answer

4 votes

Answer:

22.6

Explanation:

102÷4 1/2=22.6

You can double check this by multiplying 22.6 with 4 1/2, which will give you the answer without it being rounded.