In a developing country, two alternatives are under consideration for delivering water fiom a mountainous area to an arid area in the country's southern region. A coated heavy- gauge plastie pipeline can be installed, with pumps spaced appropriately along the pipeline. Alternatively, canal can be built; however, it will have greater water loss than the pipeline, due to evaporation and poaching along the canal route. To compensate for the water loss, the canal will have a greater carrying capacity than the pipeline. It is estimated it will cost $125 million to install the pipeline. Major replacements are planned every 15 years at the cost of $10 million. Pumping and other annual operating and maintenance costs are estimated to be $5 million. The canal will cost $200 million to construct; its annual operating and maintenance costs are anticipated to be S1 million. Major upgrades of the canal are anticipated every 10 years, at the cost of $5 million. Based on a 5 percent (5 %) MARR and an infinitely long planning horizon, which alternative has the lowest capitalized cost?

User Laseon
by
8.5k points

1 Answer

1 vote

Answer:

  • a developing country, two alternatives are under consideration for delivering water fiom a mountainous area to an arid area in the country's southern region. A coated heavy- gauge plastie pipeline can be installed, with pumps spaced appropriately along the pipeline. Alternatively, canal can be built; however, it will have greater water loss than the pipeline, due to evaporation and poaching along the canal route. To compensate for the water loss, the canal will have a greater carrying capacity than the pipeline. It is estimated it will cost $125 million to install the pipeline. Major replacements are planned every 15 years at the cost of $10 million. Pumping and other annual operating and maintenance costs are estimated to be $5 million. The canal will cost $200 million to construct; its annual operating and maintenance costs are anticipated to be S1 million. Major upgrades of the canal are anticipated every 10 years, at the cost of $5 million. Based on a 5 percent (5 %) MARR and an infinitely long planning horizon, which alternative has the lowest capitalized cost?
User Tomer Geva
by
8.3k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.