430,263 views
36 votes
36 votes
A plumber charged x dollars per hour for a 4-hour job plus $175 for parts. The to- tal charge for the service call was $415.00. Which equation can be used to deter- mine how much the plumber charged per hour? ​

User Gga
by
2.6k points

1 Answer

16 votes
16 votes

Answer:

4x + 175 = 415

Explanation:

4 is the hours, so it should be multiplied by x to see how much you get every hour (and a total of 4 hours).

175 is the constant and should be added to the equation so that all fees are included.

415 is the total amount so the equation should equal that number.

Hope this helps!

User Eddie Yang
by
3.2k points