Answer:
Manufacturing overhead volume variance= $5,000 favorable
Step-by-step explanation:
Giving the following information:
Estimated overhead allocation rate= 4 + 6= $10 per direct labor hour
Actual number of hours= 31,500
Standard hours were allowed= 32,000
To calculate the overhead volume variance, we need to use the following formula:
Manufacturing overhead volume variance= (Estimated manufacturing overhead rate*standard allocation base) - (Estimated manufacturing overhead rate* Actual amount of allocation base)
Manufacturing overhead volume variance= (10*32,000) - (10*31,500)
Manufacturing overhead volume variance= $5,000 favorable