59.7k views
1 vote
Jeremiah is painting a fence. In total he needs to paint 36 square meters. If Jeremiah can paint for square meters in one hour how many square meters does he have left

1 Answer

3 votes

Answer:

The answer is below

Explanation:

Jeremiah is painting a fence. In total he needs to paint 36 square meters. If Jeremiah can paint four square meters in one hour how many square meters does he have left

Solution:

Given that the total area if the fence to be painted is 36 square meters and the time taken to paint four square meters is one hour. Therefore, we can calculate the time required to paint the fence using:

Time required to paint fence = area of the fence / area painted in one hour

Time required to paint fence = 36 m² / (4 m² per hour)

Time required to paint fence = 9 hours

User Bon Macalindong
by
3.8k points