Answer:
65%
Step-by-step explanation:
Calculation to determine its predetermined overhead rate for the next period should be:
Using this formula
OH rate = Estimated overhead next period/direct labor
Let plug in the formula
OH rate = $65,000/$100,000
OH rate = 65%
Therefore If CWN bases applied overhead on direct labor cost, its predetermined overhead rate for the next period should be: 65%