207k views
5 votes
For a system level product support arrangement (PSA) with a Product Support Integrator (PSI) that includes metrcis of Material Avilability (AM) and Material Reliability (RM) ideally the PSI must maintain control over all applicable aspects of product support affecting system

a. True
b. False

User Khoyo
by
4.9k points

2 Answers

0 votes
The answer is true !!
User LarsH
by
5.7k points
5 votes
I think the answer is: True.
User Farhan Ali
by
5.7k points