Answer:
See below
Step-by-step explanation:
Per the given details, predetermined overhead is be calculated as seen below
Predetermined overhead = (Estimated factory overhead / Estimated direct labor hour) × 100
Estimated factory overhead = $1,560,000
Estimated direct labor hour = 260,000
Predetermined overhead = )$1,560,000 / 260,000) × 100
Predetermined overhead rate = 600%