Answer:
1. 2160 J
2. 2940 J
3. 64 J
Step-by-step explanation:
1. Determination of the work done.
Weight (W) = 180 N
Height (h) = 12 m
Workdone =?
Wd = W × h
Wd = 180 × 12
Wd = 2160 J
Thus, the Workdone is 2160 J
2. Determination of the work done.
Mass (m) = 50 Kg
Height (h) = 6 m
Acceleration due to gravity (g) = 9.8 m/s²
Workdone =?
Wd = mgh
Wd = 50 × 9.8 × 6
Wd = 2940 J
Thus, the Workdone is 2940 J
3. Determination of the work done.
Force (F) = 16 N
Distance (d) = 4 m
Workdone =?
Wd = F × d
Wd = 16 × 4
Wd = 64 J
Thus, the Workdone is 64 J