Answer:
D. $0.75 per direct labor dollar
Step-by-step explanation:
Total work in process = $2,600
- Direct materials cost = ($1,200)
- Direct labor cost = ($800)
Manufacturing overhead = $600
Predetermined overhead cost = total overhead cost / total direct labor costs = $600 / $800 = $0.75 per direct labor dollar