Answer:
Option B
Step-by-step explanation:
In simple words, Activity-based budgeting (ABC) is a better way to allocate overhead expenses. The expense of each recurrence of an overlay occurrence throughout the procedure is determined during first step of allocation. The cost of every incidence is then allocated to individual things manufactured by the company inside the second stage.
Thus, from the above we can conclude that the correct option is B.