Shelly can Soren hired a contractor to refinish her kitchen. The contractor said the job would take 49 1/2 hours. To date, the contractor has worked the following hours: 4 1/4 9 1/8 4 1/4 3 1/2 10 5/8 how much longer should the job take to be completed