Shelly can Soren hired a contractor to refinish her kitchen. The contractor said the job would take 49 1/2 hours. To date, the contractor has worked the following hours: 4 1/4 9 1/8 4 1/4 3 1/2 10 5/8 how much longer should the job take to be completed

User Swazimodo
by
5.4k points

1 Answer

3 votes

Answer:


17(3)/(4) hours

17.75 hours

Explanation:


4(1)/(4)+ 9(1)/(8)+ 4(1)/(4) + 3(1)/(2) + 10 (5)/(8)

LCM of 2, 4, and 8

2 = 2 × 1

4 = 2 × 2

8 = 2 × 2 × 2

LCM = 2 × 2 × 2 × 1

LCM = 8


4(2)/(8)+ 9(1)/(8)+ 4(2)/(8) + 3(4)/(8) + 10 (5)/(8)


(34)/(8)+ (73)/(8)+ (34)/(8) + (28)/(8) + (85)/(8)


(34+73+34+28+85)/(8)


(254)/(8)

GCF of 254 and 8

254 = 2 × 127

8 = 2 × 2 × 2

GCF = 2


(254/2)/(8/2)=(127)/(4)


49(1)/(2)- (127)/(4)

LCM of 2 and 4

2 = 2 × 1

4 = 2 × 2

LCM = 2 × 2 × 1

LCM = 4


49(2)/(4)- (127)/(4)


(198)/(4)- (127)/(4)


(198-127)/(4)


(71)/(4)=17(3)/(4)