Answer:
$48,478
Step-by-step explanation:
Calculation to determine What is the operating cash flow for this project
Operating cash flow = [$66,100 ×(1 -.35)] + [$15,750 ×.35]
Operating cash flow = [$66,100 ×.65)+5,513.
Operating cash flow = 42,965+5,513
Operating cash flow = $48,478
Therefore the operating cash flow for this project will be $48,478