Answer:
A. Both control baseline and change management
Step-by-step explanation:
In the case when the material manager provides the new product line having the procedure to control the new inventory so the internal control that impact the new product line is the control baseline and the control management as both should be impacted because the control should be there with regard to the baseline and the managing in order to managing the risk
Hence, the option a is correct