Mention any one cause for not having development of electricity in Nepal​

User Greeny
by
7.7k points

1 Answer

4 votes

Answer:

Nepal Electricity Authority (NEA) has a total installed capacity of about 746 MW [11] and 26 MW operating from mini and microhydropower plants in the hills and mountains of Nepal [12]. There is a significant energy deficit due to the poor economic and instable government to continue the electricity supply