Answer:
122fee/meter
Explanation:
Given the expression for the initial fee plus a constant fee per meter expressed as;
F = 110 + 0.12d
Is d = 100m
Substiutte into the expression and get F
F = 110 + 0.12(100)
F = 110 + 12
F = 122
Hence the required increase in price is 122fee/meter