9514 1404 393
Answer:
6 minutes
Explanation:
The rates add when expressed in terms of jobs per minute.
1/10 + 1/15 = 3/30 + 2/30 = 5/30 = 1/6
The two together can complete 1/6 jobs per minute, so it will take them 6 minutes to complete 1 job.
4.5m questions
5.8m answers