Answer:
4 pd / ft
140000 ft/pd
Explanation:
Total Weight of cable = 800 pounds
Length of cable = 200 feets
Weight per foot = Total weight / length = 800 / 200 = 4 pounds per foot
Weight of piece will be :
Weight of cable - weight per foot * x
800 - 4x
Workdone with 300 pound load attached :
∫f(x)
f(x) = (800+300 - 4x) = 1100 - 4x
∫1100 - 4xdx at 200 to 0
Integrating the above
1100x - 4/2x² at x = 200 to 0
1100x - 2x²
1100(200) - 2(200²) - 1100(0) + 2(0^²))
(220000-80000) - 0 + 0
140000 ft/pd