18.0k views
4 votes
Graph below.

Plumbing Jobs
Total Charge
(in dollars)
225
200
175
150
125
100
75
50
25
5
0 31 2 3 4
Number of Hours
4.
What is the slope of the line graphed
above?

Graph below. Plumbing Jobs Total Charge (in dollars) 225 200 175 150 125 100 75 50 25 5 0 31 2 3 4 Number-example-1

1 Answer

5 votes
Gawa nyo hindi Ko rin alam
User Peuge
by
5.0k points