233k views
1 vote
SOMEONE PLS HELP! THIS IS OVER DUE, HRLP ASAP!! I’LL GIVE 100 POINTS IF THIS IS ALL CORRECT! Work needs to be shown for all problems. ( don’t do the ones that are crossed off )

SOMEONE PLS HELP! THIS IS OVER DUE, HRLP ASAP!! I’LL GIVE 100 POINTS IF THIS IS ALL-example-1
User Mr Grumpy
by
3.3k points

2 Answers

2 votes

Answer:

Explanation:

the skateboard ramp only needs 3 pieces: 2x triangle of 4' by 6' and 1x rectangle of 3.5' by 7.2'.

the 2x triangle require 4x6/4x2 = 3 sheets of plywood

the rectangle require 3.5x7.2/4x2 = 3.15 ~4

so minimum is 7 sheets

User Sarcastyx
by
3.8k points
3 votes

Answer:

Explanation:

6. Soil volume = area * height = 1/2*4*4*2.5 = 20 cubic ft

7. Concrete volume = length * width * height = 1.8*1.8*3 = 9.72 cubic ft

Block weight = 95*9.72 = 923.4 lb

8. It is unclear but let's assume the ramp consists of 5 pieces.

The total area = 4*6+3.5*(4+6+7.2) = 84.2 sq ft

So it will require a minimum of 85.2/(4*2) = 10.65 or 11 sheets of plywood

User Hamouda
by
4.0k points