Answer:
Predetermined overhead rate
Step-by-step explanation:
The predetermined overhead rate is the rate that is computed by taking the estimated manufacturing overhead and the same would be divided by allocation factor that could be estimated direct labor, estimated direct hours, etc in order to assign the overhead cost
So according to the given situation, the first option is correct i.e. predetermined overhead rate