Answer:
He take 5 months in Brazil and 9 months in Portugal.
Explanation:
Let us assume the number of months in Portugal be P
And, the number of months in Brazil be B
So, the following equations are made
P + B = 14 ..............(1)
130P + 150B = 1920 .........(2)
We can easily write as
P = 14 - B
Now put the value of P in the second equation
So,
130(14 - B) + 150B = 1920
20B = 100
B = 100 ÷ 20 = 5
P = 14 - 5 = 9
Hence, He take 5 months in Brazil and 9 months in Portugal.