Answer:
The right solution is "$78.55".
Step-by-step explanation:
The given values are:
Material cost,
= $5 per pound
Average freight costs,
= $0.25 per pound
Downtime average,
= 0.40 hours per unit
According to the question,
The direct material cost per unit will be:
=

=

=

=
($)
The direct labor will be:
=

=

=
($)
Manufacturing overhead will be:
=

=

=
($)
hence,
The standard cost per unit will be:
=

=

=
($)