13.4k views
0 votes
Stefani Company has gathered the following information about its product. Direct materials: Each unit of product contains 4.50 pounds of materials. The average waste and spoilage per unit produced under normal conditions is 0.50 pounds. Materials cost $5 per pound, but Stefani always takes the 2.00% cash discount all of its suppliers offer. Freight costs average $0.25 per pound. Direct labor. Each unit requires 2.00 hours of labor. Setup, cleanup, and downtime average 0.40 hours per unit. The average hourly pay rate of Stefani’s employees is $12.00. Payroll taxes and fringe benefits are an additional $3.00 per hour. Manufacturing overhead. Overhead is applied at a rate of $7.00 per direct labor hour.

1 Answer

5 votes

Answer:

The right solution is "$78.55".

Step-by-step explanation:

The given values are:

Material cost,

= $5 per pound

Average freight costs,

= $0.25 per pound

Downtime average,

= 0.40 hours per unit

According to the question,

The direct material cost per unit will be:

=
((4.5+0.5)* 5* 0.98)+(0.25* (4.5+0.5))

=
(5* 5* 0.98)+(0.25* 5)

=
24.5+1.25

=
25.75 ($)

The direct labor will be:

=
((2.0+0.4)* 12)+(3* (2.0+0.4))

=
28.8+7.2

=
36 ($)

Manufacturing overhead will be:

=
(2.0+0.4)* 7

=
2.4* 7

=
16.8 ($)

hence,

The standard cost per unit will be:

=
Direct \ material+Direct \ labor+Manufacturing \ overhead

=
25.75+36+16.8

=
78.55 ($)

User Bernd
by
4.4k points