Answer:
$1.4
Step-by-step explanation:
Calculation to determine the minimum transfer price that the Lumber Division could accept
Using this formula
Minimum transfer price =Variable production cost per bd. ft.+(Variable selling cost per bd. ft. -per board foot saved in shipping costs)
Let plug in the formula
Minimum transfer price= $1.25 +($0.50-$0.35)
Minimum transfer price=$1.25+$0.15
Minimum transfer price=$1.4
Therefore the minimum transfer price that the Lumber Division could accept is $1.4