Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 50 parts. A part requires 3 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 5 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place.

User Udarts
by
4.6k points

1 Answer

3 votes

Answer and Explanation:

The calculation is given below:-

Particulars Traditional Philosophy Manufacturing

Lean Philosophy

Value added 3 + 7 = 10 10

Non value added 10 × (50 - 1) = 490 10 × (5 - 1) = 40

Total lead time 500 50

Value-added ratio

(as a percent) 10 ÷ 500 × 100 = 2% 10 ÷ 50 × 100 = 20%

User Can Karabag
by
4.3k points