Calculate the work done if a boy lifts a bag of cement 500N to the floor of a lorry 2.5m above the ground

User Tauseef
by
4.4k points

1 Answer

3 votes

Answer:

W = 1250 J = 1.25 KJ

Step-by-step explanation:

The work done by the boy is due to the change in the position of the cement vertically. Hence, the work done in this case will be equal to the potential energy of the cement:


W = P.E\\W = mgh

where,

W = Work done = ?

mg = W = weight of cement = 500 N

h = height covered = 2.5 m

Therefore,


W = (500\ N)(2.5\ m)

W = 1250 J = 1.25 KJ