101k views
0 votes
ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

User Syam
by
5.7k points

1 Answer

5 votes

Answer:

100% of the work was done by him

User Bossylobster
by
5.7k points