menu
Qammunity.org
Login
Register
My account
Edit my Profile
Private messages
My favorites
Ferroconcrete is reinforced concrete that combines concrete and ________. A. Lead c. Copper b. Iron d. Aluminum.
Ask a Question
Questions
Unanswered
Tags
Ask a Question
Ferroconcrete is reinforced concrete that combines concrete and ________. A. Lead c. Copper b. Iron d. Aluminum.
asked
Nov 2, 2023
148k
views
2
votes
Ferroconcrete is reinforced concrete that combines concrete and ________. A. Lead c. Copper b. Iron d. Aluminum.
Engineering
college
Hobgoblin
asked
by
Hobgoblin
8.3k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
9
votes
Answer:
B. Iron
Step-by-step explanation:
took the test.
Uhuru
answered
Nov 8, 2023
by
Uhuru
8.7k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
Sep 26, 2021
108k
views
Ferroconcrete is reinforced concrete that combines concrete and a lead C. copper b. iron d. aluminum Please select the best answer from the choices provided
Yaoshiang
asked
Sep 26, 2021
by
Yaoshiang
8.0k
points
Arts
middle-school
1
answer
2
votes
108k
views
asked
Sep 20, 2024
54.5k
views
What is the primary benefit to construction using ferroconcrete?
Pax Beach
asked
Sep 20, 2024
by
Pax Beach
8.4k
points
Arts
high-school
1
answer
3
votes
54.5k
views
asked
Jan 24, 2024
234k
views
Is a type of construction where the main load-bearing elements are hung from suspension cables that are then suspended from vertical supports anchored into the ground or a riverbed. a. Domino c. Ferroconcrete
Ander Acosta
asked
Jan 24, 2024
by
Ander Acosta
8.9k
points
Engineering
college
1
answer
2
votes
234k
views
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.4m
questions
12.2m
answers
Categories
All categories
Mathematics
(3.7m)
History
(955k)
English
(903k)
Biology
(716k)
Chemistry
(440k)
Physics
(405k)
Social Studies
(564k)
Advanced Placement
(27.5k)
SAT
(19.1k)
Geography
(146k)
Health
(283k)
Arts
(107k)
Business
(468k)
Computers & Tech
(195k)
French
(33.9k)
German
(4.9k)
Spanish
(174k)
Medicine
(125k)
Law
(53.4k)
Engineering
(74.2k)
Other Questions
A piston-cylinder device fitted with stops in the cylinder walls contains 2.1 kg of water initially at 150 kPa and 30 °C. Heat is transferred to the system until the final temperature reaches 250 °C. The
4. Which of the following is the first thing you should do when attempting to park? A. Securing the parking spot by standing in it B. Turning on your hazard lights C. Confirming the space can fit your
A water towers lowest point is 405 ft and the main line is 6 feet below the ground. The ground elevation is at 276 ft. The main line travels 2.9 miles. The pipe will travel through the following flanged
Twitter
WhatsApp
Facebook
Reddit
LinkedIn
Email
Link Copied!
Copy
Search Qammunity.org