Each visor requires a total of $4.00 in direct materials that includes an adjustable closure that the company purchases from a supplier at a cost of $2.00 each. Shadee wants to have 27 closures on hand on May 1, 20 closures on May 31, and 28 closures on June 30 and variable manufacturing overhead is $1.25 per unit produced. Suppose that each visor takes 0.30 direct labor hours to produce and Shadee pays its workers $12 per hour.

Budgeted Production in Units:

May 585
June 410

Required:
a. Determine Shadee's budgeted manufacturing cost per visor. (Note: Assume that fixed overhead per unit is $1.90.) (Round your answer to 2 decimal places.)
b. Compute the Shadee's budgeted cost of goods sold for May and June.

User Jdmichal
by
5.1k points

1 Answer

3 votes

Answer:

A. $10.75

B. May $6,288.75

June $4,407.5

Step-by-step explanation:

A . Calculation to Determine Shadee's budgeted manufacturing cost per visor.

Budgeted direct Material $4.00

Direct labor $3.6

(0.30*$12)

ariable manufacturing overhead is $1.25

Fixed overhead per unit is $1.90

Budgeted manufacturing cost per visor $10.75

Therefore Shadee's budgeted manufacturing cost per visor is $10.75

B. Computation for Shadee's budgeted cost of goods sold for May and June.

May June

Expected sales units 585 410

Minimum cost per unit $10.75 $10.75

Budgeted cost of goods sold for May and June

$6,288.75 $4,407.5

May (585*$10.75=$6,288.75)

June(410*$10.75=$4,407.5)

Therefore the budgeted cost of goods sold for May is $6,288.75 and June is $4,407.5.