197k views
6 votes
Help me please !

The city of Claremont is planning to make a 5-foot wide path around the outside of a park that is 190 feet by 110 feet. They will choose between concrete and mulch. The concrete will cost $6.05 per square foot and the
much will cost $1.42 per square foot. How much will the city save by choosing to use much? Enter the answer in the box

User Xjmdoo
by
3.4k points

1 Answer

9 votes

Answer:

The answer is $1,0427 that is the answer

User Rabs
by
3.9k points